top of page

2020 - 2022 Feasibility Study Materials Archive

Between 2020 and 2022, Hays County conducted a feasibility study to identify a preferred route and develop preliminary engineering plans up to approximately 20% design. As the project progresses through additional design and environmental review, the recommended route will be refined. These documents are shared for transparency and historical reference and do not reflect the current design.​ Please consult the most recent project materials for the latest information and updates.

​

bottom of page