top of page

The purpose of this project is to improve pavement conditions and enhance safety. Existing road conditions include one lane in each direction with deteriorating pavement and no shoulders. This area continues to grow, and improvements are needed to keep traffic flowing safely.
This project is currently in the final design phase.
COST: $11.5M

IMPROVEMENTS
Widen the existing roadway to include:
-
Reconstructed travel lane in each direction (no median)
-
Shoulders on both sides of the road
-
Turn lanes
ANTICIPATED SCHEDULE
Final Design
Construction
Through Summer 2026
Summer 2026 - Summer 2027
bottom of page
