top of page

RM 150 East

SH 21 to Lehman Road

Commissioner Ingalsbe, Precinct 1 & Commissioner Cohen, Precinct 2
RM 150 East Map_20260211.png

As Hays County continues to grow, this study aims to determine the feasibility of widening RM 150 east of I-35. Existing road conditions include one lane in each direction with a continuous center turn lane and shoulders on both sides.

 

The feasibility study will evaluate widening the road to include two lanes in each direction with a median and turn lanes. The focus is to improve safety and mobility for all travelers. Currently only the feasibility study is funded. If it is determined that widening is feasible, future phases would include additional design and it could be done in partnership with TxDOT and the City of Kyle.

COST: $425K
RM 150 East Typical Section.jpg
IMPROVEMENTS

Evaluate the feasibility of widening the existing roadway to include:

  • Two lanes in each direction separated by a median

  • Turn lanes at intersections

  • Shoulders on both sides of the roadway

ANTICIPATED SCHEDULE

Feasibility Study

Design & Construction

2026 - 2027

Not Funded

RIGHT OF WAY

This is a feasibility study, and right-of-way needs will be determined as a part of the study and future design phases.