Windy Hill Road 

Purple Martin Avenue to FM 2001

Commissioner Cohen, Precinct 2
11 Hays Co_Windy Hill Rd Interim Map-20260305.png

Hays County is planning improvements to enhance safety, improve mobility, and increase traffic capacity along Windy Hill Road. The roadway currently has one lane in each direction with no shoulders or turn lanes. 

Preliminary design was completed in 2020. The County is now advancing the project through detailed design, right-of-way (ROW) acquisition, and utility coordination. Construction is not currently funded.

COST: $31.5M
TwoLanesEachDirection_MiddleTurnLane_Shoulders.png
IMPROVEMENTS

Widen the existing roadway to include:

  • Two lanes in each direction with a center turn lane

  • Signalized intersection at Shadow Creek Boulevard and Crosswinds Parkway 

  • Shoulders on both sides of the road

ANTICIPATED SCHEDULE

Detailed Design 

ROW Acquisition

Utility Coordination

Construction

 

Late 2025 - 2027

2020 - Late 2026

2020 - Mid 2027

Not Funded

RIGHT OF WAY

Additional ROW may be needed to expand the roadway. As design progresses, the county will begin coordinating with property owners. 

PREVIOUS ENGAGEMENT MATERIALS

Previous phases of the project and public engagement included an interim three-lane roadway design (one-lane in each direction with a center-turn lane) with a phased approach to eventually widen the roadway to five lanes (two lanes in each direction with a center turn lane) as traffic demands increase and funding becomes available. Due to significant growth and new residential developments around Windy Hill, the County is moving forward with the five-lane configuration to accommodate this continued growth and minimize disruptions to the community for multiple construction projects.