SEGMENT 1 COST: $22.8M*
SEGMENT 2 COST: $11.2M*
*Both segments include funding for design and ROW acquisition. Segment 1 also includes funding for utility relocation.
Hays County is advancing the final design for a new roadway that extends Yarrington Road from the existing RM 150, west of Arroyo Ranch, to I-35. This project is intended to add capacity, enhance safety, improve connectivity, and provide an alternative to RM 150 as the region grows.
The County first began studying improvements to RM 150 in 2014, evaluating a range of alternatives, including expanding the existing roadway and potential new alignments. This process included analysis of environmental impacts, natural and cultural resources such as floodplains, water quality, historical properties, and endangered and threatened species, as well as coordination with property owners and a robust public engagement process. A preferred route was identified, and schematic design was completed in 2024.
Hays County is using a phased approach deliver near-term transportation relief through an interim design, while planning for the ultimate four-lane roadway footprint now. Utilities, drainage, and right-of-way (ROW) needs are being designed now to accommodate the future buildout.
INTERIM IMPROVEMENTS
-
One travel lane in each direction (no median)
-
Shoulders on both sides of the roadway
-
Turn lanes at key intersections
-
A 10-foot shared use path for pedestrians
and cyclists

ULTIMATE IMPROVEMENTS
-
Two travel lanes in each direction separated by median ranging from approximately 6 to 40 feet
-
Shoulders on both sides of the roadway
-
A 10-foot shared use path for pedestrians and cyclists on both sides of the roadway


INTERSECTION TREATMENTS
-
Signalized intersection at Blanco Vista Road
-
Roundabout at Roland Lane
-
Overpass at Old Stagecoach Road
-
Overpass at 6 Creeks Boulevard
-
Future intersection with Cypress Road, planned by the City of Kyle
ANTICIPATED SCHEDULE
Final Design
ROW Acquisition
Utility Coordination
Construction
2026 - 2027
2026 - 2027
2026 - 2028
Not Funded
RIGHT OF WAY
The anticipated ROW width for the new alignment and ultimate configuration ranges from approximately 120 to 185 feet. Hays County has been in coordination with affected property owners and will continue to share updates as design progresses.