Hays County, in coordination with the Texas Department of Transportation (TxDOT), is planning a new alignment of FM 2001 to enhance safety and connectivity in this rapidly growing area. 

​

The County and TxDOT have worked together to identify, design, and construct improvements along several segments of FM 2001. In 2020, TxDOT completed the schematic design and environmental assessment for a new alignment of FM 2001 from I-35 to SH 21. This section of the roadway would ultimately consist of two lanes in each direction, divided by a median, and sidewalks on both sides. These long-term improvements are intended to support future transportation needs and would only be constructed as growth necessitates and funding becomes available. 

​

The current phase of the project focuses on completing design plans to address existing transportation needs by constructing one lane in each direction separated by a median. Coordination with property owners and utility providers is also included in this phase of the project.

​

Hays County has been awarded approximately $15.2 million in CAMPO funding for the FM 2001 project. The FM 2001 East Interim project has received $12,814,451 for construction of a new alignment to include one travel lane in each direction, a median, shoulders on both sides of the road, and turn lanes at intersections.

CONSTRUCTION COST: $21.5M
2021: $5.8M in CAMPO funding;
2026: $12.8M in CAMPO funding
large-fm 2001 typical section.png
IMPROVEMENTS

Construct a new alignment of FM 2001 to include:

  • One travel lane in each direction separated by a median

  • Shoulders on both sides of the road

  • Turn lanes at intersections

2020 - Late 2027

2020 - Fall 2026

2020 - Mid 2026

Early 2028 - Mid 2029

ANTICIPATED SCHEDULE

Final Design

ROW Acquisition

Utility Relocation

Construction

RIGHT OF WAY

Because the roadway will follow a new alignment, this project will require additional ROW to construct improvements. ROW acquisition is underway. 

TxDOT MAINTENANCE WORK

TxDOT will be working to smooth out FM 2001 from Satterwhite Road to SH 21. By this fall, a new riding surface will be installed on the road to improve road conditions for drivers in the area.